English Translation

Special Instructions

Product Installation Instructions

● First-time use:
Before use, separate part ② (bottle body) from part ④ (base). Remove part ③ (electrolysis plate cover), then reinstall it to begin normal operation.

Diagram labels:
① Top cover
② Bottle body
③ Electrolysis plate cover
④ Main base

● Mineral Water Bottle Installation:

Diagram labels:
④ Main base
⑤ Mineral water bottle adapter
Water level line (approx. 70% full)